LOADING

ABOUT US

Performing to the best of our capabilities with our client's interest at heart.

CASE STUDIES

Here are a few A To Z Building case studies that highlight our capabilities.

We literally have hundreds of others to show if you're looking for a specific kind of job you don't see here. For these and other projects, we will be happy to provide our Point of Contact's contact information and any additional case studies you may require.


US NAVY /NAVFAC (Naval Facilities Engineering Command) SOUTHWEST


Project Description:  The facility in Port Hueneme, California needed a comprehensive clean-up to get it into shipshape. A To Z provided a work plan, safety plan, notifications to proper authorities for all water damage remediation, asbestos, lead and mold abatement while providing and maintaining job site documentation and reporting.


CA- Department of Transportation, Contract 07A3528


Project Description:  Provided services for: utility disconnection and abandonment, securing sites, obtained AQMD, city and other permits, sewer cap, and fire line termination. As-well-as, asbestos, lead and other hazardous abatement, demolition, and erosion control. Provided and maintained job site documentation & reporting.

Contract Year: 2014


CA- Department of Transportation, Contract 07A2926.


Project Description:  Provided services for: securing sites, obtained AQMD, city and other permits, sewer cap, and fire line termination. As-well-as, asbestos, lead and other hazardous abatement, demolition, and erosion control. Provided and maintained job site documentation & reporting.

Contract Year: 2011


CA- Department of Transportation, Contract 07A3154E:
Hazardous Waste Abatement - Multiple Contractor Award


Project Description: Provided services for: securing sites, obtaining AQMD, MPDES city and other permits.

De-watering project from oil pipeline relocation. A To Z provided a water filtration system, monitored and collected water for analysis prior to discharging cleaned water to sewer lines — disposing of sludge and filters as Hazardous Material.


CA- Department of Transportation, Contract 07A3055


Project Description: Provided the water treatment system to treat extracted ground water from dewatering operation, (from the Pipeline Relocation effort), to accommodate the freeway expansion project. Collected and submitted samples for analysis. Maintained and made changes to the treatment system to ensure the discharge limits were met per NPDES requirements prior to water discharge to the storm drain.

Contract Year: 2009

Image

Hydro Blaster Lead Paint Removal



A To Z Building is committed to the highest standards of…


quality, safety and customer service.

<CONTACT US